Home/Buyer guide

Buyer guide

Choose a platform.
Fit the space to the operation

Use staffing, equipment, customer interface, towing or placement strategy and growth plan to compare MobiAir, MobiEdge, MobiCube and technical model references.

Best for
Buyers comparing size and platform families
Commercial path
Model selection guide
Multiple MOBITRUCK platform sizes and shapesReal MOBITRUCK® platform / Configuration varies

What the configuration must solve

Plan the operation.
Then build the unit.

The final engineering and local approval path depend on the selected equipment, jurisdiction and licensed professionals. This page organizes the commercial brief before those decisions are locked.

01

Operating footprint

The brief begins with operating footprint. We map the operating requirement before openings, access points and utilities are frozen.

02

Platform character

Platform character is coordinated with equipment loads, service access and the intended customer journey—not treated as an afterthought.

03

Transport strategy

We define transport strategy against the selected build level, local review path and realistic transport constraints.

04

Expansion plan

Expansion plan keeps the exterior identity and the commercial interior working as one system from concept through handoff.

Operating logic

From customer arrival
to service handoff.

  1. 01

    Define the business

    Share the concept, menu or service, operating city, team size, equipment list and target opening date.

  2. 02

    Select the platform

    Match the operating footprint to MobiAir, MobiEdge, MobiCube or a technical model reference.

  3. 03

    Lock the build level

    Choose shell, builder-ready, turnkey or a repeatable fleet program before engineering begins.

  4. 04

    Engineer and deliver

    Coordinate drawings, manufacturing, inspection milestones, Deerfield Beach integration and delivery scope.

Typical scope topics

Decisions to define.

01MobiAir signature form02MobiEdge operating volume03MobiCube modular planning04Technical model comparison05Prototype before fleet

Before you build

Questions
to resolve.

01Can this page be used as a final specification?+

No. It is a planning and marketing guide. The signed proposal, approved drawings and equipment schedule control the final configuration.

02Can MOBITRUCK support a shell-only project?+

Yes. Shell-first is a primary path, with builder-ready, turnkey and fleet scopes available when the project needs more integration.

03Who confirms permits and code acceptance?+

The local authority having jurisdiction makes the final determination. MOBITRUCK coordinates available documentation while the buyer and qualified local professionals confirm site-specific requirements.

Build the right scope

Tell us the application,
location and target date.

Get price & lead time