Approved shell-kit package
Approve the model, openings, interfaces, finish, exclusions and receiving party before shell-kit production begins in Estonia.
U.S. shell completion series
Use this checklist when MOBITRUCK, Concession Nation and the buyer's qualified builder divide shell-kit manufacturing and preparation in Estonia, U.S. rolling-shell assembly and final-build responsibilities. The signed proposal and actual unit documents remain controlling.
Real MOBITRUCK® platform / Configuration variesWhat the configuration must solve
The final engineering and local approval path depend on the selected equipment, jurisdiction and licensed professionals. This page organizes the commercial brief before those decisions are locked.
Approve the model, openings, interfaces, finish, exclusions and receiving party before shell-kit production begins in Estonia.
Before release, verify the physical VIN label, Concession Nation manufacturer identity, MCO and applicable vehicle-certification records for the actual rolling shell.
Match the Dexter axle model and measured rolling-shell weight to the supplied file, then record any additional unit-specific rating or brake information.
The receiving builder records condition, measurements, documents, open items and exceptions before accepting the next completion stage.
Operating logic
Confirm model, dimensions, openings, access, interfaces, represented origin, exclusions and the U.S. receiving party.
Confirm the American VIN, MCO / Certificate of Origin, MANUFACTURED BY certification label, Dexter axle model, measured rolling-shell weight and unit-specific written warranty package.
Record condition, physical VIN label, supplied documents, measurements, running-gear identification, open items and acceptance or exceptions.
Add the receiving builder's equipment schedule, inspection records, authority decisions, bill of sale and warranty documents to the rolling-shell records.
Typical scope topics
Before you build
No. It is a planning guide. The signed MOBITRUCK kit proposal, Concession Nation VIN/certification and rolling-shell documents, and receiving builder's completion contract control the deliverables.
Yes. The location does not change the need to identify every supplied component, document, inspection responsibility and warranty boundary before transfer.
No. Concession Nation coverage for its supplied rolling shell and receiving-builder coverage for its completion work should be written before final payment.
Build the right scope